ITEP Home
ORCA Home
«
Back to List
Edit
ORCA Data
FileName
CategoryCode
Waste
Air
Energy
Other
Emergency Response
Radiation
Indoor Air
Water
Chemical Substances and Toxics
Climate
Wastewater
General Environmental, Multimedia
Contaminated Sites
Underground Storage Tanks, Aboveground Storage Tanks
SubCategoryCode
Mitigation, Remediation, Cleanup
Outreach
Policy, Permitting, Regulations, Guidance
Science, Technology
Funding
Health
Training, Education
Natural Resources
Management
Adaptation
Other
Impacts
Environmental Quality
Sampling, Monitoring
Sovereignty
Traditional Knowledges, Tribal Lifeways
Subsistence
Risk Assessment
Environmental Justice
Data
SOPs, Manuals, Handbooks
Tribal Codes, Ordinances
Title
2010 Oversight Summary Report, Leviathan Mine Superfund Site, Alpine County, California
Authors
Burleson Consulting, Inc.
Keywords
USEPA Region Nine, field oversight, mine drainage, capture, treatment, Water Quality Control Board, Lahontan Region, Atlantic Richfield Company, site activities
Date_Pub
Pages
URL
DocumentLocation
Description
This oversight summary report describes the activities completed and the information collected during Burleson Consulting, Inc. (Burleson) field oversight at the Leviathan Mine Superfund Site (Leviathan Mine) in Alpine County, California. Field oversight was provided from April 27, 2010, through November 18, 2010. Burleson performed oversight for the U.S. Environmental Protection Agency (EPA), Region IX, under contract with the U.S. Army Corps of Engineers (USACE), Sacramento District (Contract No. W91238-08-D-0012). Burleson personnel were on site once every three weeks during the 2010 Leviathan Mine construction and water treatment season (May to November). The primary focus of field oversight was to: (1) monitor the effects of mine drainage capture and treatment on the quality of Leviathan Creek and associated creeks downstream from the mine, and (2) confirm that work conducted by the California Regional Water Quality Control Board—Lahontan Region (Regional Board) and Atlantic Richfield Company (Atlantic Richfield) followed the approved work plans.